Cooling Systems
Prof. Christian J. L. Hermes
Head
- + 55 (48) 3721-7900
- hermes@polo.ufsc.br
Check out some of our services, research, and training below to learn more. Also, see the best contract type for your company by clicking "Terms and Conditions."
- Characterization of the thermodynamic performance of refrigerators
- Performance characterization of expansion devices
- Measuring the aerodynamic performance of fans and air circuits
- Measurement of the thermo-fluid-dynamic performance of heat exchangers
- Development of controls for refrigeration system components
- Identification of heat fluxes through the walls of refrigerated compartments
- Measurement of air velocity distribution inside refrigerated compartments
- Measurement of air infiltration through gaskets in refrigerated compartments
- Thermographic analysis of refrigeration components and systems
- Determination of thermal conductivity of insulating materials

Research benches
We have several benches for component characterization. Hot-cycle calorimeter, capillary tube heat exchanger, and flash-freezing tunnel.

Systems Development
We are specialists in developing refrigeration systems through advanced engineering using experimental and computational tools.

Systems Testing
We have a complete laboratory infrastructure, with 8 air-conditioned chambers for testing refrigeration systems built according to specifications

Wind tunnels
We have wind tunnels for characterizing fans and heat exchangers, aerodynamic wind tunnels, and calorimeters.
Domestic Refrigerators
We specialize in experimental analysis and computational simulation of different architectures of domestic refrigerators and their components, aiming at reducing
Commercial Refrigerators
We have experience in light commercial refrigeration systems, including display cabinets, ice cream freezers, beer coolers, among others.
Heat Pump
We have the installed capacity to experimentally evaluate the performance of heat pumps for residential use.
The Refrigeration Systems Team offers both short-term and long-term contract models.
Check below and choose the best one for your company:
Advanced Engineering Service Term
- No intellectual property protection
- Immediate Start
- State-of-the-art testing facilities
- Product optimization
Research and Innovation Agreement
- Intellectual property protection
- 30 to 60 days to start activities
- Construction of knowledge
- Technology development